Project Scope:

The primary task involved restoring the structural integrity of the structural post-tension tendon reinforcing system, including the removal of 204 PT end anchors that were replaced with the encapsulated anchors. Additional repairs and upgrades included installing two types of traffic coating throughout the garage, new LED lighting, new Fire Suppression System, and a new exterior glazing